There are three phases of the project currently in design including the Napa Valley, Forest Road and 4th Avenue segments. The most up to date maps are separated by project in the subpages in the navigation column on the left side of the page. The original Preliminary Engineering Report maps can also be found there.

Please keep in mind that the Napa Valley, Forest Road and 4th Avenue Phase maps (approximately 30%) are at a much higher design level than the Preliminary Engineering Report maps (approximately 10%).